Campus Improvements
BUTTERFIELD ELEMENTARY
- New cafe tables for cafeteria
- Playground inspection to ensure safety and improvements
- New ADA doors and improvements to exterior drainage areas
- Installation of Front Office Secured Access Point
- Digital marquee
- Courtyard and landscaping repairs and renovations
- Installation of partitions and additional classroom improvements
- Redesign parking lot and area traffic flow to include bus-loading lane with accessible sidewalk loading.
- New crosswalk.
COYOTE TRAIL ELEMENTARY
- New sidewalk
- Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces
- Installation of Front Office Secured Access Point
- Digital marquee
- Installation of operable partitions
- Storm prevention and safety improvements
DEGRAZIA ELEMENTARY
- Redesign front entry and office space
- Parking lot redesign, pave dirt pad for additional parking; build wall between sidewalk and parking lot; front benches; signage Playground inspection to ensure safety and improvements
- Pick Up Zone Shade Structure
- Playground repairs and upgrades; new swing sets, shade structure, drainage improvements
- Installation of Front Office Secured Access Point
- Digital marquee
- Roofing improvements
- Outdoor amphitheater shade
- Outdoor amphitheater ground resurfacing/artificial turf - Spring 2020
ESTES ELEMENTARY
- Kindergarten, PAL and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces; new PAL shade structure and swings
- Air Conditioning Replacement
- PAL Classroom & Bathroom renovations
- Installation of Front Office Secured Access Point
- Digital marquee
- Roofing improvements
GLADDEN FARMS ELEMENTARY
- Bike path and loading ramp improvements
- Whiteboards and sound system
- Digital marquee
IRONWOOD ELEMENTARY
- Landscaping and walkway by library
- New library windows
- Playground inspection to ensure safety and improvements; new play area shade and outdoor speakers
- Redesign of Parent Driving Loop and shade structure
- New bell system
- Exterior drainage improvements; expansion of amphitheater
- Nurses office remodel and ADA exit path improvements
- Installation of Front Office Secured Access Point
- Digital marquee
MARANA HIGH SCHOOL
- Additional security equipment and doors; new fire alarm system
- Baseball and softball practice field repairs; fencing; baseball sidewalks, new baseball dugouts, softball backstop/dugouts
- Track maintenance, repair, re-striping, re-surface
- Wade McLean Pool - pool decking repairs, lane lights replacement, and tile wall repairs
- Awning repairs and new paint
- New outdoor Food Kiosks, ticket booth, dance room flooring
- Outdoor bleachers refurbished and pathways to meet ADA compliance
- New metal shop classrooms and renovation of science classrooms
- Additional outdoor seating/shade area for students
- New K Building and Culinary area with classrooms and kitchen
- Front office redesign, front fencing
- Security upgrades
- Complete fiber network replacement
- Flood control improvements and well upgrades
- New CNG fuel station and electrical, and gutters
- New Gym Floor and Sound System
- Welding and metal fabrication area re-design
- Digital marquee
- Installation of Front Office Secured Access Point
MARANA MIDDLE SCHOOL
- Redesign outdoor stadium, replace football bleachers
- Repair basketball standards; motorized
- Renovations of Front lobby and security enhancements
- New café sound system and double stack oven
- New blinds/window coverings and fencing
- Digital marquee
MOUNTAIN VIEW HIGH SCHOOL
- Redesign lobby and front entry and office area, security enhancements, new fiber network
- Track maintenance, repair, re-striping
- Additional outdoor seating/shade area for students, charging stations
- Parking lot upgrades
- Pavers in courtyard and in front of auditorium
- New outdoor Food Kiosks
- New window coverings
- New LED Lighting
- Outdoor bleachers refurbished to meet ADA compliance
- New College, Career, and Life Skills Center
- Baseball/Softball ADA upgrades
- Stadium parking upgrades and gate access, ticket booth
- Exterior campus upgrades including pavers, grading, ground cover, electrical replacement, drainage upgrades
- Digital marquee
- New Gym Floor and Lighting System
MCAT HIGH SCHOOL
- Digital marquee
- Installation of Front Office Secured Access Point
- New flooring, paint, additional classroom improvements
PICTURE ROCKS ELEMENTARY
- Redesign preschool and Family Resource area on extended campus
- Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces, shade structure
- Nurses office remodel
- New walk-in freezer
- New classroom whiteboards and stage curtain
- New backstop and extended courtyard seating, exterior speaker system and security features
- Installation of Front Office Secured Access Point
- Digital marquee
- Installation of shade structure at Parent Driving Loop
QUAIL RUN ELEMENTARY
- Addition of fencing around bus loop/ playground
- Playground inspection to ensure safety and improvements
- Landscaping in courtyard
- Installation of Front Office Secured Access Point
- Digital marquee
- Improved traffic flow and painting of parking lot
RATTLESNAKE RIDGE ELEMENTARY
- Playground inspection to ensure safety and improvements
- Installation of Front Office Secured Access Point
- Digital marquee
ROADRUNNER ELEMENTARY
- Playground inspection to ensure safety and improvements
- New air-conditioning and upgrades
- Cafeteria flooring upgrade and parking lot upgrades
- Installation of Front Office Secured Access Point
- Digital marquee
THORNYDALE ELEMENTARY
- New cafe tables for cafeteria
- Playground inspection to ensure safety and improvements
- New outdoor fencing and front office doors
- Digital marquee
TORTOLITA MIDDLE SCHOOL
- Parking lot with redesigned bus and parent drop-off
- Repair basketball standards; motorized
- New window coverings and blinds
- Greenhouse style classroom roof covered and windows
- Installation of Front Office Secured Access Point
- Digital marquee
- New Gym Floor
TWIN PEAKS K-8
- Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces
- Air Conditioning Replacement
- Outdoor upgrades; sidewalks
- Installation of Front Office Secured Access Point
- 10 classrooms to accommodate for conversion to K-8
- Digital marquee
- Redesign and improvements to parking area and Parent Loop
- Relocation and improvements to all Modulars
- Fiber Network upgrade
- New school-wide Intercom/PA/Clock System
- Campus exterior painted
*Updated January 2020