Skip To Main Content

Campus Improvements

I voted stickers on US Flag background

BUTTERFIELD ELEMENTARY

  • New cafe tables for cafeteria
  • Playground inspection to ensure safety and improvements
  • New ADA doors and improvements to exterior drainage areas
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • Courtyard and landscaping repairs and renovations
  • Installation of partitions and additional classroom improvements
  • Redesign parking lot and area traffic flow to include bus-loading lane with accessible sidewalk loading.
  • New crosswalk. 

COYOTE TRAIL ELEMENTARY

  • New sidewalk
  • Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • Installation of operable partitions
  • Storm prevention and safety improvements

DEGRAZIA ELEMENTARY

  • Redesign front entry and office space
  • Parking lot redesign, pave dirt pad for additional parking; build wall between sidewalk and parking lot; front benches; signage Playground inspection to ensure safety and improvements
  • Pick Up Zone Shade Structure
  • Playground repairs and upgrades; new swing sets, shade structure, drainage improvements
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • Roofing improvements
  • Outdoor amphitheater shade 
  • Outdoor amphitheater ground resurfacing/artificial turf - Spring 2020 

ESTES ELEMENTARY

  • Kindergarten, PAL and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces; new PAL shade structure and swings
  • Air Conditioning Replacement
  • PAL Classroom & Bathroom renovations
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • Roofing improvements

GLADDEN FARMS ELEMENTARY

  • Bike path and loading ramp improvements
  • Whiteboards and sound system
  • Digital marquee

IRONWOOD ELEMENTARY

  • Landscaping and walkway by library
  • New library windows
  • Playground inspection to ensure safety and improvements; new play area shade and outdoor speakers
  • Redesign of Parent Driving Loop and shade structure
  • New bell system
  • Exterior drainage improvements; expansion of amphitheater
  • Nurses office remodel and ADA exit path improvements
  • Installation of Front Office Secured Access Point
  • Digital marquee

MARANA HIGH SCHOOL

  • Additional security equipment and doors; new fire alarm system
  • Baseball and softball practice field repairs; fencing; baseball sidewalks, new baseball dugouts, softball backstop/dugouts 
  • Track maintenance, repair, re-striping, re-surface
  • Wade McLean Pool - pool decking repairs, lane lights replacement, and tile wall repairs
  • Awning repairs and new paint
  • New outdoor Food Kiosks, ticket booth, dance room flooring
  • Outdoor bleachers refurbished and pathways to meet ADA compliance
  • New metal shop classrooms and renovation of science classrooms
  • Additional outdoor seating/shade area for students
  • New K Building and Culinary area with classrooms and kitchen
  • Front office redesign, front fencing
  • Security upgrades
  • Complete fiber network replacement
  • Flood control improvements and well upgrades
  • New CNG fuel station and electrical, and gutters
  • New Gym Floor and Sound System
  • Welding and metal fabrication area re-design
  • Digital marquee
  • Installation of Front Office Secured Access Point

MARANA MIDDLE SCHOOL

  • Redesign outdoor stadium, replace football bleachers
  • Repair basketball standards; motorized
  • Renovations of Front lobby and security enhancements
  • New café sound system and double stack oven
  • New blinds/window coverings and fencing
  • Digital marquee

MOUNTAIN VIEW HIGH SCHOOL

  • Redesign lobby and front entry and office area, security enhancements, new fiber network 
  • Track maintenance, repair, re-striping
  • Additional outdoor seating/shade area for students, charging stations
  • Parking lot upgrades
  • Pavers in courtyard and in front of auditorium
  • New outdoor Food Kiosks
  • New window coverings
  • New LED Lighting
  • Outdoor bleachers refurbished to meet ADA compliance
  • New College, Career, and Life Skills Center
  • Baseball/Softball ADA upgrades
  • Stadium parking upgrades and gate access, ticket booth
  • Exterior campus upgrades including pavers, grading, ground cover, electrical replacement, drainage upgrades
  • Digital marquee
  • New Gym Floor and Lighting System

MCAT HIGH SCHOOL

  • Digital marquee
  • Installation of Front Office Secured Access Point
  • New flooring, paint, additional classroom improvements

PICTURE ROCKS ELEMENTARY

  • Redesign preschool and Family Resource area on extended campus
  • Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces, shade structure
  • Nurses office remodel
  • New walk-in freezer
  • New classroom whiteboards and stage curtain
  • New backstop and extended courtyard seating, exterior speaker system and security features
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • Installation of shade structure at Parent Driving Loop

QUAIL RUN ELEMENTARY

  • Addition of fencing around bus loop/ playground
  • Playground inspection to ensure safety and improvements
  • Landscaping in courtyard
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • Improved traffic flow and painting of parking lot

RATTLESNAKE RIDGE ELEMENTARY

  • Playground inspection to ensure safety and improvements
  • Installation of Front Office Secured Access Point
  • Digital marquee

ROADRUNNER ELEMENTARY

  • Playground inspection to ensure safety and improvements
  • New air-conditioning and upgrades
  • Cafeteria flooring upgrade and parking lot upgrades
  • Installation of Front Office Secured Access Point
  • Digital marquee

THORNYDALE ELEMENTARY

  • New cafe tables for cafeteria
  • Playground inspection to ensure safety and improvements
  • New outdoor fencing and front office doors
  • Digital marquee

TORTOLITA MIDDLE SCHOOL

  • Parking lot with redesigned bus and parent drop-off
  • Repair basketball standards; motorized
  • New window coverings and blinds
  • Greenhouse style classroom roof covered and windows
  • Installation of Front Office Secured Access Point
  • Digital marquee
  • New Gym Floor

TWIN PEAKS K-8

  • Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces
  • Air Conditioning Replacement
  • Outdoor upgrades; sidewalks
  • Installation of Front Office Secured Access Point
  • 10 classrooms to accommodate for conversion to K-8
  • Digital marquee
  • Redesign and improvements to parking area and Parent Loop
  • Relocation and improvements to all Modulars
  • Fiber Network upgrade
  • New school-wide Intercom/PA/Clock System 
  • Campus exterior painted

*Updated January 2020