Campus Specific Improvements

  • Below are campus-specific capital improvements derived from the Tuesday, November 4, 2014 voter-approved school improvement bond. Additional district-wide capital improvements include new classroom furniture for every school, the construction and/or expansion of multiple schools within the community, and more.

Butterfield Elementary

  • Completed

    • New cafe tables for cafeteria
    • Playground inspection to ensure safety and improvements
    • New ADA doors and improvements to exterior drainage areas
    • Installation of Front Office Secured Access Point
    • Digital marquee
    • Courtyard and landscaping repairs and renovations
    • Installation of partitions and additional classroom improvements
    • Redesign parking lot - completion Fall 2019

Coyote Trail Elementary

  • Completed

    • New sidewalk
    • Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces
    • Installation of Front Office Secured Access Point
    • Digital marquee
    • Installation of operable partitions
    • Storm prevention and safety improvements

DeGrazia Elementary

  • Completed

    • Redesign front entry and office space
    • Parking lot redesign, pave dirt pad for additional parking; build wall between sidewalk and parking lot; front benches; signage Playground inspection to ensure safety and improvements
    • Pick Up Zone Shade Structure
    • Playground repairs and upgrades; new swing sets, shade structure, drainage improvements
    • Installation of Front Office Secured Access Point
    • Digital marquee
    • Roofing improvements
    • Outdoor amphitheater shade and resurfacing - Winter 2020

Estes Elementary

  • Completed

    • Kindergarten, PAL and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces; new PAL shade structure and swings
    • Air Conditioning Replacement
    • PAL Classroom & Bathroom renovations
    • Installation of Front Office Secured Access Point
    • Digital marquee
    • Roofing improvements

Gladden Farms Elementary

  • Completed

    • Bike path and loading ramp improvements
    • Whiteboards and sound system
    • Digital marquee

Ironwood Elementary

  • Completed

    • Landscaping and walkway by library
    • New library windows
    • Playground inspection to ensure safety and improvements; new play area shade and outdoor speakers
    • Redesign of Parent Driving Loop and shade structure
    • New bell system
    • Exterior drainage improvements; expansion of amphitheater
    • Nurses office remodel and ADA exit path improvements
    • Installation of Front Office Secured Access Point
    • Digital marquee

Marana High School

  • Completed

    • Additional security equipment and doors; new fire alarm system
    • Baseball and softball practice field repairs; fencing; baseball sidewalks, new baseball dugouts, softball backstop/dugouts 
    • Track maintenance, repair, re-striping, re-surface
    • Wade McLean Pool - pool decking repairs, lane lights replacement, and tile wall repairs
    • Awning repairs and new paint
    • New outdoor Food Kiosks, ticket booth, dance room flooring
    • Outdoor bleachers refurbished and pathways to meet ADA compliance
    • New metal shop classrooms and renovation of science classrooms
    • Additional outdoor seating/shade area for students
    • New K Building and Culinary area with classrooms and kitchen
    • Front office redesign, front fencing
    • Security upgrades
    • Complete fiber network replacement
    • Flood control improvements and well upgrades
    • New CNG fuel station and electrical, and gutters
    • New Gym Floor and Sound System
    • Welding and metal fabrication area re-design
    • Digital marquee
    • Installation of Front Office Secured Access Point

Marana Middle School

  • Completed

    • Redesign outdoor stadium, replace football bleachers
    • Repair basketball standards; motorized
    • Renovations of Front lobby and security enhancements
    • New café sound system and double stack oven
    • New blinds/window coverings and fencing
    • Digital marquee

Mountain View High School

  • Completed

    • Redesign lobby and front entry and office area, security enhancements, new fiber network 
    • Track maintenance, repair, re-striping
    • Additional outdoor seating/shade area for students, charging stations
    • Parking lot upgrades
    • Pavers in courtyard and in front of auditorium
    • New outdoor Food Kiosks
    • New window coverings
    • New LED Lighting
    • Outdoor bleachers refurbished to meet ADA compliance
    • New College, Career, and Life Skills Center
    • Baseball/Softball ADA upgrades
    • Stadium parking upgrades and gate access, ticket booth
    • Exterior campus upgrades including pavers, grading, ground cover, electrical replacement, drainage upgrades
    • Digital marquee
    • New Gym Floor and Lighting System

MCAT High School

  • Completed

     

    • Digital marquee
    • Installation of Front Office Secured Access Point
    • New flooring, paint, additional classroom improvements

     

Picture Rocks Elementary

  • Completed

    • Redesign preschool and Family Resource area on extended campus
    • Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces, shade structure
    • Nurses office remodel
    • New walk-in freezer
    • New classroom whiteboards and stage curtain
    • New backstop and extended courtyard seating, exterior speaker system and security features
    • Installation of Front Office Secured Access Point
    • Digital marquee
    • Installation of shade structure at Parent Driving Loop

Quail Run Elementary

  • Completed

    • Addition of fencing around bus loop/ playground
    • Playground inspection to ensure safety and improvements
    • Landscaping in courtyard
    • Installation of Front Office Secured Access Point
    • Digital marquee

Rattlesnake Ridge Elementary

  • Completed

    • Playground inspection to ensure safety and improvements
    • Installation of Front Office Secured Access Point
    • Digital marquee

Roadrunner Elementary

  • Completed

    • Playground inspection to ensure safety and improvements
    • New air-conditioning and upgrades
    • Cafeteria flooring upgrade and parking lot upgrades
    • Installation of Front Office Secured Access Point
    • Digital marquee

Thornydale Elementary

  • Completed

    • New cafe tables for cafeteria
    • Playground inspection to ensure safety and improvements
    • New outdoor fencing and front office doors
    • Digital marquee

Tortolita Middle School

  • Completed

    • Parking lot with redesigned bus and parent drop-off
    • Repair basketball standards; motorized
    • New window coverings and blinds
    • Greenhouse style classroom roof covered and windows
    • Installation of Front Office Secured Access Point
    • Digital marquee
    • New Gym Floor

Twin Peaks K-8

  • Completed

    • Kindergarten and regular playground surface repair; gravel replaced with wood chips; tiles replaced with rubberized surfaces
    • Air Conditioning Replacement
    • Outdoor upgrades; sidewalks
    • Installation of Front Office Secured Access Point
    • 10 classrooms to accommodate for conversion to K-8
    • Digital marquee
    • Redesign and improvements to parking area and Parent Loop
    • Relocation and improvements to all Modulars
    • Fiber Network upgrade
    • New school-wide Intercom/PA/Clock System - Fall 2019
  • *Updated August 2019